We had the same problem with the old HMP site at Bay and George street. The illegal parking lot was in operation for over a year before the city decided to actually charge him. The developer then appealed to the OMB. The city then delayed the OMB hearing for six months to give him extra time to prepare a site plan. When the OMB hearing finally took place, the developer failed to show up and the illegal lot was eventually separated with concrete blocks.

The illegal lot operated for over two years, and likely generated over $100k in revenue during that time.

These flagrant (and lucrative) violations of the law need to be pursued quickly and firmly.