Comment 91852

By Mal (anonymous) | Posted September 07, 2013 at 07:35:13

I assume that the plan would eventually be to run it the full length of Cannon, as Yes We Cannon advocates.

Important to remember that this is a pilot project, and as such the implementation may look very different and much cheaper than the permanent iteration (hence running only half the intended distance and, per the motion, possibly not including nothing more than paint and knockdown sticks -- the pilot formulation used on Main West over the 403 bridge ( http://goo.gl/maps/9JGPj ).

Permalink | Context

Events Calendar

There are no upcoming events right now.
Why not post one?

Recent Articles

Article Archives

Blog Archives

Site Tools

Feeds