Comment 82150

By seancb (registered) - website | Posted October 25, 2012 at 08:44:06

This is cool and it sounds like it will be slightly more impressive than a simple open air platform :-)

I'm excited about better go service. Now let's get some LRT lines laid so that we can all take advantage of it without having to fill that parking lot.

What if we did a mini loop from st. joes to the new go station. a one direction loop using st josephs drive, james, turn at the rail right of way and go back up john and repeat. no turnarounds, no changing directions, no switching tracks, just a constant loop. At main/king you would connect to the b line at hughson from either direction via a covered walkway.

In my heart I still believe this all should have happened at Hunter. Tunnel be damned. We can build a highway under a canal (thorold) and we can blow 7 lanes up and down the escarpment (claremont access). We can put highway 5 over highway 6. But we can't engineer a second rail line from bayview junction to the hunter station?

Priorities.

Permalink | Context

Events Calendar

There are no upcoming events right now.
Why not post one?

Recent Articles

Article Archives

Blog Archives

Site Tools

Feeds