Comment 65570

By Pxtl (registered) - website | Posted July 05, 2011 at 13:12:17 in reply to Comment 65556

In general, it will be running east/west through town along King (although they have something strange planned to get it onto Main as it crosses the bridge into Ainsliewood). The LRT tracks will be laid along the South side of the street, and the North side will remain 1-way vehicular traffic. Those LRT lanes will be lost to normal traffic.

Because of how cramped King is east of John, I imagine they'll have to rip out the street-side parking bump-outs in order to get traffic up to 3 or 4 lanes (2 of which will be consumed by the LRT tracks) or make it pedestrian-only altogether.

Each stop will include a proper platform in that you walk directly onto the train on flat ground - no stepping up into the train.

Permalink | Context

Events Calendar

There are no upcoming events right now.
Why not post one?

Recent Articles

Article Archives

Blog Archives

Site Tools

Feeds