Several hundred million needs to be spent on transportation links to make that site work starting with the completion of the Perimeter Road project"

Give your head a shake. The transportation studies were done, WH was better for access than East Mountain by far,the bottle necks created by the limited access at EM would have led to interminable traffic jams. The dispersed nature of parking downtown leads to far better ingress and egress patterns There is a train station being build by GO Transit a mere couple hundred meters from the site. There are no significant public transit nodes at EM. It is a greenfield with no infrastructure. The low side in difference in cost was $80 million in favour of WH.

Again moot. At this point neither are likely to happen.