Comment 118857

By ref_erendum (registered) | Posted May 27, 2016 at 13:03:21

Sept 13,2012 ( Hamilton Spectator) The LRT HUB was to be @ the Queenston Traffic Circle with the purchase of the City Motor Hotel for 1.96 million dollars. Up until only recently is Metrolinx telling us that Eastgate has not been in the picture for quite some time, and yet in 2012 it was known to be the hub prior to them reducing the route by 2kms. If Metrolinx can mislead us about this crucial issue what else are they not telling us ? Take a look at Edmonton and see what a waste of tax dollars look like. Stoically I say NO to an LRT. Simply a proposal to lose road traffic on our king street corridor.

Permalink | Context

Events Calendar

There are no upcoming events right now.
Why not post one?

Recent Articles

Article Archives

Blog Archives

Site Tools

Feeds