By Haveacow (registered) | Posted June 24, 2015 at 09:27:01

There is a similar planned redesign of Queen Street, 2 blocks south of Wellington Street and Parliament Hill in downtown Ottawa. Queen Street is also the location of the downtown tunnel for the Confederation Line LRT project. All the heavy tunnel construction is planned to be done by summer 2017 (July 1st). The complete first phase of the Confederation Line will be open in the fall of 2018. When the summer of 2017 is over as well as most of the Canada 150 celebrations, the Queen Street surface redesign project is expected to begin.