Comment 110241

By Pxtl (registered) - website | Posted March 14, 2015 at 18:25:32 in reply to Comment 110223

King could be managed as 2-way downtown. As much as the bus-lane was hopelessly bungled, it did demonstrate that King can function with less lanes, because Cannon is configured as a bypass for through-traffic.

I don't think you could ever get Cannon and Main converted 2-way, but I think King downtown could be done. Do King from Victoria to Queen and put a sign up at Victoria for a Cannon street bypass. Then 2-way convert Wellington, Hughson, Mary, Bay, and Hess between Cannon and Main - this provides convenient access to the now-slower King from the bypasses.

Then run the B-line LRT on Main.

Permalink | Context

Events Calendar

There are no upcoming events right now.
Why not post one?

Recent Articles

Article Archives

Blog Archives

Site Tools

Feeds