Comment 87554

By Shempatolla (registered) - website | Posted March 29, 2013 at 00:56:59 in reply to Comment 87548

The Claremont is built. There is no cost effective way to "unbuild it". Remember how it came to be. It was conceived and built during a time when there were very large amounts of industrial truck traffic moving up and down Highway 6 to and from Nanticoke to both the steel and Hydro generating station.
You can propose lane reductions sure. But we are stuck with that infrastructure.
Personally I don't mind the fact that we have the option of multiple access routes up and down the escarpment.

Permalink | Context

Events Calendar

There are no upcoming events right now.
Why not post one?

Recent Articles

Article Archives

Blog Archives

Site Tools

Feeds