Comment 107237

By Fred Street (anonymous) | Posted December 19, 2014 at 14:05:24 in reply to Comment 107225

Weird that planned bike infrastructure only extends from Fairwood to the CN bridge (100m from the entrance to a Mobility Hub), but since two-thirds of this road is within the riding of Burlington (south of Old Waterdown Rd.), maybe the absence of same was a concession made in exchange for Hamilton footing 95% of the bill.

Permalink | Context

Events Calendar

There are no upcoming events right now.
Why not post one?

Recent Articles

Article Archives

Blog Archives

Site Tools

Feeds